How can a team avoid accumulating all testing at the end of a sprint?
Answer
Slice work vertically, agree examples early, test components and contracts continuously, prepare data and environments ahead, and keep work-in-progress low. The team finishes small increments together instead of handing a large batch to QA.
Strong answer includes
- vertical slicing
- continuous feedback
- limits WIP and handoffs
Practical example
A team that used to test everything in the last two days of a sprint switched to finishing one vertical slice of a feature end-to-end per day, with the QA engineer testing each slice as it landed, which eliminated the sprint-end crunch entirely.