What evidence should be preserved in a production-incident timeline?
Answer
Record timestamps with a consistent time zone for detection, declaration, user impact, major observations, decisions, mitigations, recovery and follow-up. Link alerts, dashboards, queries, traces, deployments, feature-flag or configuration changes and communication updates while preserving the evidence available at the time, not hindsight. Note source uncertainty and clock skew, protect sensitive data, and capture who owned each decision so another person can reconstruct both system behaviour and response latency.
Strong answer includes
- separates observation, decision and action
- links telemetry and change evidence
- records uncertainty and time consistency
Practical example
During a checkout outage, the incident channel timeline notes 14:02 UTC alert fired (link to Alertmanager), 14:05 UTC incident declared SEV2 by Maria, 14:07 UTC dashboard shows error rate at 40% (screenshot linked), 14:09 UTC team notices a deploy at 13:58 UTC correlates with onset, 14:12 UTC rollback initiated, 14:15 UTC error rate back to baseline. When the postmortem author reviews it a week later, the linked evidence lets them verify the 14-minute detection-to-mitigation time precisely instead of relying on people's memory.