What are the current DORA software delivery metrics, and how do they differ from the older four-key model?
Answer
The current model groups five metrics into throughput and instability: change lead time, deployment frequency and failed deployment recovery time measure throughput, while change fail rate and deployment rework rate measure instability. This split explicitly separates 'how fast' from 'how safely,' whereas the older four-keys framing is commonly cited without the rework-rate addition. Treat the metrics as trend signals connected to team and service context, not as a cross-team leaderboard, and confirm the exact current definitions against DORA's own materials before quoting numbers, since the framework has evolved.
Strong answer includes
- separates throughput metrics from instability metrics
- explicitly flags the older four-key framing as outdated
- warns against using DORA metrics as a team ranking
Practical example
A director asked for 'the four DORA metrics' during a review; the QA lead corrected the framing, presented all five current metrics grouped as throughput versus instability, and showed each team's own trend over the last six quarters instead of ranking teams against each other on a single chart.