What entry and exit criteria would you define for a performance test?
Answer
Entry criteria establish that the test can produce trustworthy evidence: a deployable build, stable and understood environment, representative data, validated scripts, known workload profile, monitoring, synchronized clocks where needed and sufficient load-generator capacity. Exit criteria are measurable objectives such as percentile latency, throughput, error rate, resource or saturation limits, stability and recovery expectations, plus a rule for unresolved anomalies. The numbers must come from requirements, SLOs, risk or an agreed baseline.
Strong answer includes
- entry criteria protect test validity and observability
- exit criteria are quantitative and tied to an explicit workload
- does not invent SLA numbers without a source
Practical example
Do not state 'p95 under 500 ms' unless that 500 ms is an actual requirement or agreed baseline-derived gate. The criterion is meaningful only together with the traffic level and scenario it applies to.